More gunwale / gunnel embrightenment.
Floor taken up at the front. Concrete that lies beneath was painted by a glamorous assistant.
The boat is actually a cut-and-shut, where it was lengthened at some point in the past. When this was done, the new section didn't have ballast added (no concrete betwixt the ribs on the floor) and I'm told that council-spec (higher density, and heavier) paving slabs are the way forwards. They're 600mm x 600mm x 50mm. Measuring the ribs, it's going to be a tight fit - perhaps with some hammer-based coercion required...
A morning of computer and paperwork before another afternoon on the boat awaits. Next filming day is Thursday, should be a reasonable amount of progress to show.
Floor taken up at the front. Concrete that lies beneath was painted by a glamorous assistant.
The boat is actually a cut-and-shut, where it was lengthened at some point in the past. When this was done, the new section didn't have ballast added (no concrete betwixt the ribs on the floor) and I'm told that council-spec (higher density, and heavier) paving slabs are the way forwards. They're 600mm x 600mm x 50mm. Measuring the ribs, it's going to be a tight fit - perhaps with some hammer-based coercion required...
A morning of computer and paperwork before another afternoon on the boat awaits. Next filming day is Thursday, should be a reasonable amount of progress to show.
No comments:
Post a Comment